Foundations, Floors, and Walls Are Critical Green Connections

Air sealing is imperative. The connection between concrete foundations and wood framing is a place prone to air leaks and moisture problems. Wood is often warped, and concrete is rarely flat. There are at least three places for air to leak in and probably a lot more. Leaky connections can mean energy, moisture, comfort, and IAQIndoor air quality. Healthfulness of an interior environment; IAQ is affected by such factors as moisture and mold, emissions of volatile organic compounds from paints and finishes, formaldehyde emissions from cabinets, and ventilation effectiveness. problems. Extending the wall sheathingMaterial, usually plywood or oriented strand board (OSB), but sometimes wooden boards, installed on the exterior of wall studs, rafters, or roof trusses; siding or roofing installed on the sheathing—sometimes over strapping to create a rainscreen. past these connections is a good first step whenever practical. Caulks, adhesives, spray foam, and gaskets can seal them up tightly.

Keep water at bay

Unless you live in the desert, the ground is always wet; and that ground water is always pushing its way in. Footing drains can carry away bulk groundwater, but foundations also have to disrupt capillarity. Water in the soil will wick all the way up to the roof framing if you let it. CapillaryForces that lift water or pull it through porous materials, such as concrete. The tendency of a material to wick water due to the surface tension of the water molecules. breaks such as brush-on damp-proofing, sill sealer, and rigid insulation block this process. A foundation is a bad place to cut corners because problems are expensive and complicated to fix after a house is finished.

The simplest way to ensure that all elements of your air barrierBuilding assembly components that work as a system to restrict air flow through the building envelope. Air barriers may or may not act as a vapor barrier. The air barrier can be on the exterior, the interior of the assembly, or both. system connect up is to take a footing-to-ridge cross section drawing of your building and connect the air barrier from the footing to the ridge without lifting your pencil or cursor. Typically, the tough spots will be transitions from one assembly to another (for example foundation to above-grade wall) and penetrations like windows and dormers. These details are a part of that process, keeping the pencil or cursor flowing from footing to ridge (or top floor ceiling).

DRAWING DETAIL

Download: PDF | DWG

Tags: , , , , , , , , , , , , , , ,