Helpful? 0

Living space

Hello,
I'm planning to build a new home on Houston city limit. I would like to build a 2500 sq/ft living space house, but for not be to hard on the budget I would like to live the live unfinished 2 bedroom. In other word take all the mechanical (AC duct, electric) to the room and noting else but just framing.
The builder told me that the city of Houston will not allow that but it also could be that the builder do not want me to save money.
Can you help me with that?

Thanks

Asked by Rocco Locaso
Posted Fri, 05/30/2014 - 13:43

Tags:

3 Answers

Select your preferred way to display the comments and click "Save settings" to activate your changes.
1.
Helpful? 0

Rocco,
If I understand your question correctly, you want to live in an unfinished house. Unfortunately, the building departments in many cities and towns won't provide an occupancy permit -- that is, a permit that allows you to live in a house -- until the house has been substantially completed. If you have any doubts about the regulations in Houston, you should contact the building department.

Answered by Martin Holladay, GBA Advisor
Posted Fri, 05/30/2014 - 14:07

2.
Helpful? 0

Rocco, As Martin said most jurisdictions have rules around unfinished parts of a structure. Here the area has to be insulated with the electrical and plumbing roughed in. To protect these from mechanical damage the first four feet of the walls must be drywalled. The spaces can also only be used for storage, not as an integral part of the living spaces. At that point there is so little left to do to finish the rooms, while a pause means the work costs much more later to get all the trades back, that most people opt to do it all at once.
Building regulations aside, you might also want to check with your bank. Mortgage holders and insurance companies hate unfinished projects.

Answered by Malcolm Taylor
Posted Fri, 05/30/2014 - 19:26
Edited Fri, 05/30/2014 - 19:27.

3.
Helpful? 0

Thanks a lot for your help.

Answered by Rocco Locaso
Posted Mon, 06/02/2014 - 13:14

Other Questions in Building Code Questions

Rising power plant energy cost

In Energy efficiency and durability | Asked by Terry Lee | Oct 15, 14

Thermal energy storage

In Green building techniques | Asked by Jim Pancanke | Oct 21, 14

Enclosed room on slab

In Energy efficiency and durability | Asked by Jason Schatz | Oct 16, 14

“Air-sealed” can light retrofit vs. Tenmat cover in attic?

In Energy efficiency and durability | Asked by andrew c | Jun 22, 14

What is the best ventilation system for a passive design cafe/restaurant?

In PassivHaus | Asked by monita taghva | Oct 20, 14
Register for a free account and join the conversation


Get a free account and join the conversation!
Become a GBA PRO!