0 Helpful?

Tear-down with an existing uninsulated basement: convert to slab on grade?

This question might have an obvious answer, but I haven't been able to dig up anything on google. If I were to purchase a tear-down property that had an existing uninsulated, fieldstone basement, what would be the best course of action to build a high performance house? Fill it in with dirt then to then create a slab on grade? Tear out the fieldstone and use the existing cavity to create an insulated basement (while also hopefully re-using the fieldstone on site for something useful like a wall)? I know slab on grade is easier to insulate and I have no particular desire to have a basement, but almost all existing properties in New England have a basement so I'm amenable either way. If I were to fill it in it would almost seem more trouble than it's worth, plus I'd have concerns about the earth settling after construction. Any thoughts on this?

Asked by Ethan Fahy
Posted Jul 21, 2014 2:56 PM ET

Tags:

2 Answers

Select your preferred way to display the comments and click "Save settings" to activate your changes.
1.

Ethan,
I think you should build the kind of foundation you prefer, whichever one that is. If cost is an issue, then you should talk to excavation contractors and concrete contractors to get estimates of the two approaches. I suspect that a slab will be cheaper.

I like basements, so I would probably want to include a basement. But it's your house.

Answered by Martin Holladay
Posted Jul 22, 2014 4:41 AM ET

2.

"Fill it with dirt" is not a good option unless it is thoroughly compacted to engineered specifications. The alternative is washed stone fill, which is expensive. If you have a hole in the ground under your house I'd recommend you use it rather than fill it.

Answered by James Morgan
Posted Jul 26, 2014 2:21 PM ET

Other Questions in Green building techniques

Should I do a birdsmouth cut for low sloped (tiny house) shed roof?

In Green building techniques | Asked by Grey Wolf | May 25, 17

Average lighting, appliance and plug loads for PV sizing?

In Mechanicals | Asked by Burke Stoller | May 23, 17

Slab on grade and wet room floor question

In Green building techniques | Asked by John Brown | May 25, 17

Can I combine floor and wall heating in a solar passive house to avoid overheating?

In Mechanicals | Asked by Micheline Freyssonnet | May 22, 17

Well water pumps

In Mechanicals | Asked by Steve Young | May 24, 17
Register for a free account and join the conversation


Get a free account and join the conversation!
Become a GBA PRO!