Blower Door Testing
-
Construction Sequencing in High-Performance Building
Leveling up on building enclosure details requires flexibility in the work schedule and extra cooperation from other trades
-
Prioritizing Home Performance Upgrades, Part 2
How to tackle energy efficiency improvements to get the best results—a case study
-
Blower Door Testing for Contractors
Beyond measuring a building's airtightness, blower doors and manometers are used for several additional diagnostic tests
-
The Fundamentals of Thermal Imaging
Learn how to use an IR camera for identifying problem places in a building enclosure
-
Another Look at Spray Foam
From the development of blowing agents to post-installation field testing, expert Henri Fennell covers spray foam topics sure to be familiar as well as new terrain
-
Pretty Good House Benchmarks and Assemblies
Meet high-performance energy efficiency goals by following the PGH approach to designing and building
-
Building Science Trivia Time
IBS 2024 inspires a homegrown game designed for GBA readers
-
Overview of Panelized Construction
A look at the benefits, manufacturing and delivery methods, and potential pitfalls of prefabricated building enclosures
-
Adding Exterior Insulation to Existing Homes
Firsthand experience informs this basic plan for installing rigid insulation on the outside of an older building
-
Getting the Most Out of Blower Door Test Results
Understanding blower door calculations beyond air exchanges per hour at 50 Pascals can yield useful information for achieving efficiency goals