GBA Logo horizontal Facebook LinkedIn Email Pinterest Twitter X Instagram YouTube Icon Navigation Search Icon Main Search Icon Video Play Icon Plus Icon Minus Icon Picture icon Hamburger Icon Close Icon Sorted

Community and Q&A

moisture barrier for slab foundation in CZ 2

merlinm | Posted in General Questions on

Concrete slab foundation in CZ 2 getting ready to be poured. Finished floor will be polished concrete.  Slab consists of a grid of deep grade beams with a 6″ slab. The beams and slab will be one monolithic pour. 

Opinions sought on whether the moisture barrier should be continuous or whether the bottom of the grade beams should be left open. 

Thanks.

GBA Prime

Join the leading community of building science experts

Become a GBA Prime member and get instant access to the latest developments in green building, research, and reports from the field.

Replies

  1. Expert Member
    PETER G ENGLE PE | | #1

    The moisture barrier must be continuous. This is not fun with grade beams, but still very important. Buy lots of tape that is compatible with your moisture barrier. You'll need it.

  2. merlinm | | #2

    Thanks, Peter. The structural engineer who designed the foundation says the bleed water at the bottom of the beam needs somewhere to go. Some of the grade beams are 6 to 8' deep. Soil is limestone rock.

Log in or create an account to post an answer.

Community

Recent Questions and Replies

  • |
  • |
  • |
  • |