GBA Logo horizontal Facebook LinkedIn Email Pinterest Twitter Instagram YouTube Icon Navigation Search Icon Main Search Icon Video Play Icon Plus Icon Minus Icon Picture icon Hamburger Icon Close Icon Sorted

Community and Q&A

What fasteners to use with Cedar Shingles over 1″ IKO Enerfoil?

evanmacdonald9 | Posted in General Questions on

My wall composition will be: 2×6 studs, 1/2″ plywood, 1″ IKO Enerfoil (R7), perhaps a breathing mesh? and Cedar Shakes/Shingles. I’m wondering what you folks recommend for a fastener (length/type)?

Thanks!

GBA Prime

Join the leading community of building science experts

Become a GBA Prime member and get instant access to the latest developments in green building, research, and reports from the field.

Replies

  1. GBA Editor
    Martin Holladay | | #1

    Evan,
    Cedar shingles cannot be installed directly over rigid foam, so you'll need to include a layer of Home Slicker (a plastic drainage mat) between the back of the shingles and the rigid foam.

    Here is the standard recommendation for shingle fasteners: "Fasteners should be long enough to penetrate into the sheathing at least 3/4 inch or all the way through." With the 1-inch rigid foam and the 1/4-inch Home Slicker, you'll need to select fasteners that are at least 1 1/4 inch longer than usual. Make sure that your fasteners have a slender diameter, so you don't split the shingles. Needless to say, you want galvanized or stainless-steel fasteners.

    More info here: Sidewall Fastener Guidelines.

  2. evanmacdonald9 | | #2

    Thanks for the reply I'll check out the additional info

Log in or create an account to post an answer.

Community

Recent Questions and Replies

  • |
  • |
  • |
  • |