I am working on insulating my basement from the interior. I would like to install a 1" layer of EPS as shown in the Fine Homebuilding "The Stay-Dry, No-Mold Finished basement". At this point we are about to pour concrete around the perimeter of the basement where we installed a drain tile, as well as a new 10x10 slab in one corner of the basement. Is there a certain amount of time I need to let the new concrete cure before covering it with the EPS? If I have access to commercial polysio, is that ok for use over a basement slab?

Thanks for any feedback

Asked by Charles Chiampou
Posted Jun 6, 2014 6:12 PM ET

Tags:

1 Answer

Select your preferred way to display the comments and click "Save settings" to activate your changes.
1.

Charles,
Your slab will continue to cure even if it is covered with rigid foam, so you can pursue your plan after just a few days, as long as you aren't encountering any problems with your TapCon fasteners.

Do you know whether your existing slab has polyethylene under it? Many older slabs don't. If I were you, I would stick with EPS or XPS in this location, in case the older slab ever got wet. Polyisocyanurate doesn't perform very well when it gets wet, and it won't have the same compressive strength as XPS or EPS.

Answered by Martin Holladay, GBA Advisor
Posted Jun 7, 2014 6:39 AM ET
Edited Jun 7, 2014 6:41 AM ET.

Other Questions in Energy efficiency and durability

CMU walls and rigid foam

In GBA Pro help | Asked by Robert Brown | Aug 29, 15

Third-party filters for Zehnder HRV / ERV units?

In Mechanicals | Asked by Lance C | Aug 29, 15

Has anyone had experience with the Unico small duct system?

In Mechanicals | Asked by Andrew Bennett | Apr 29, 15

Minisplit or furnace?

In Mechanicals | Asked by Mark Buckingham | Aug 28, 15

Alpen vs Inline

In Green products and materials | Asked by David Mosijchuk | Mar 25, 15
Register for a free account and join the conversation


Get a free account and join the conversation!
Become a GBA PRO!